|
Callout |
Component Name |
|---|---|
Preliminary Procedure
|
|
|
1 |
Air Conditioning Compressor Bolt (Qty :3) Caution: Refer to Fastener Caution.
22 Y (16 lb ft) |
|
2 |
Air Conditioning Compressor Assembly Procedure
When replacing the air conditioning compressor, balance the compressor oil. Refer to Air Conditioning Compressor Oil Balancing. |
Air Conditioning Compressor Replacement (LDE, LUW, LWE)
Air Conditioning Compressor and Condenser Hose Replacement (LDE/LWE)Brake Rotor Refinishing
Special Tools
CH-41013 Rotor Resurfacing Kit
CH-42450-A Wheel Hub Resurfacing Kit
For equivalent regional tools, refer to Special Tools.
Warning: Refer to Brake Dust Warning.
Note:
The disc brake rotors do not require refinishing as part of routine
brake system servic ...
Instrument Panel Center Air Outlet Replacement
Instrument Panel Center Air Outlet Replacement
Callout
Component Name
Preliminary Procedure
Remove the instrument panel center molding. Refer to Instrument Panel
Center Molding Replacement.
1
In ...
Fuel Feed Pipe Replacement
Removal Procedure
.-
Remove the fuel feed pressure sensor. Refer to Fuel Pressure Sensor
Replacement - Fuel Feed Pipe.
Disconnect the fuel feed pipe (1). Refer to Plastic Collar Quick Connect
Fitting Service.
Remove the plastic retainer (1) ...