|
Callout |
Component Name |
|---|---|
|
1 |
Air Conditioning Evaporator Hose Assembly Nut. Caution: Refer to Fastener Caution.
22 Y (16 lb ft) |
|
2 |
Air Conditioning Evaporator Hose Assembly Procedure
Discard and replace all sealing washers. Refer to Air Conditioning System Seal Replacement. |
Air Conditioning Evaporator Core Replacement
Air Conditioning Evaporator Thermal Expansion Valve ReplacementSteering Linkage Inner Tie Rod Inspection
Special Tools
GE-8001 Dial Indicator Set
For equivalent regional tools, refer to Special Tools.
Note: This inspection procedure does not supersede local government
required inspections that have more stringent requirements.
Turn the ignition key to the ON position with the eng ...
Input and Output Speed Sensor Removal
Input and Output Speed Sensor Removal
Callout
Component Name
1
A/Trans Output Speed Sensor Bolt M6 x 18 (Qty: 1)
2
A/Trans Output Speed Sensor Assembly
...
Throttle Body Heater Inlet Pipe Replacement (LUW)
Throttle Body Heater Inlet Pipe Replacement
Callout
Component Name
Preliminary Procedure
Drain the cooling system. Refer to Cooling System Draining and Filling.
1
Throttle Body Heater Inlet Pipe
...