|
Callout |
Component Name |
|---|---|
|
Preliminary Procedure
Remove the instrument panel insulator, if equipped. |
|
|
1 |
Blower Motor Resistor Screw (Qty: 2) Caution: Refer to Fastener Caution. |
|
2 |
Blower Motor Resistor Procedure
Disconnect the wiring connector. |
Heater and Air Conditioning Evaporator and Blower Module Removal and Installation
HeatingDoor Lock Switch Replacement
Door Lock Switch Replacement
Callout
Component Name
Preliminary Procedure
Remove the heater and air conditioning control. Refer to Heater and Air
Conditioning Control Replacement.
1
Door Lock Sw ...
Brake Rotor Assembled Lateral Runout Measurement
Special Tools
CH-41013 Rotor Surfacing Kit
CH-42450-A Wheel Hub Resurfacing Kit
CH-45101 Hub and Wheel Runout Gauge
CH-45101-100 Conical Brake Rotor Washers
For equivalent regional tools, refer to Special Tools.
Warning: Refer to Brake Dust Warning.
Note:
B ...
Fuel Injector Replacement
Fuel Injector Replacement
Callout
Component Name
Preliminary Procedure
Disconnect battery negative cable. Refer to Battery Negative Cable
Disconnection and Connection.
Remove the fuel injection fuel rail assembly. Refer t ...