|
Callout |
Component Name |
|---|---|
Preliminary Procedures
|
|
|
1 |
Evaporative Emissions Canister Vent Solenoid Valve Procedure
Turn the evaporative emission canister vent solenoid valve counter clockwise 45 degrees and remove the solenoid from the evaporative emissions canister. |
Evaporative Emission Canister Purge Solenoid Valve Replacement
PCVFront End Upper Tie Bar Replacement
Front End Upper Tie Bar Replacement
Callout
Component Name
Preliminary Procedures
Disable the SIR system. Refer to SIR Disabling and Enabling.
Remove the front fascia. Refer to Front Bumper Fascia Replacement.
Rem ...
Adhesives, Fluids, Lubricants, and Sealers
Adhesives, Fluids, Lubricants, and Sealers
Application
Type of Material
GM Part Number
United States
Canada
Wheels
Valve Stem
TPM
Mounting Lubricant
9985709
...
Input, Reaction, and Output Carrier Disassemble
Input, Reaction, and Output Carrier Disassemble
Callout
Component Name
1
Output Carrier Assembly
Note:
The 6T30 and 6T40 have 4 pinions.
The 6T45 and 6T50 have 5 pinions.
...