|
Callout |
Component Name |
|---|---|
Preliminary Procedures
|
|
|
1 |
Evaporative Emissions Canister Vent Solenoid Valve Procedure
Turn the evaporative emission canister vent solenoid valve counter clockwise 45 degrees and remove the solenoid from the evaporative emissions canister. |
Evaporative Emission Canister Replacement (Steel Tank)
Evaporative Emission Control System DescriptionAir Vents
Use the air vents located in the center and on the side of the instrument panel
to direct the airflow. Move the slats on the center air vents to direct airflow.
Turn the knobs on the side air vents counterclockwise or clockwise to open or
close off the airflow.
Operation Tips
Clear away an ...
Front Side Door Lock Cylinder Coding (Free Wheeling)
Special Tools
BO-49753 Assembly Tool
The door lock cylinder uses 8 of the 8?€‰cut positions. The tumbler positions
are staggered from side to side, 4 on one side and 4 on the other, are not self-retaining,
and are not snap in.
Note: All lock cylinders for side milled keys ha ...
Secondary Air Injection Pump Replacement
Secondary Air Injection Pump Replacement
Callout
Component Name
1
Secondary Air Injection Pump Inlet Pipe
Note: Squeeze the retainer on opposite sides to release.
2
Secondary ...