|
Callout |
Component Name |
|---|---|
|
1 |
Final Drive Sun Gear |
|
2 |
Differential Carrier Assembly |
Front Differential Carrier Cleaning and Inspection
Front Differential Carrier Installation (6T40/45/50)Lock Cylinder Coding - Ignition
The ignition lock cylinder uses 8 key cut positions, 1–8. The ignition cylinder
tumblers (3) are located on alternate sides of the cylinder (5). They are not snap-in
and are not self-retaining. It follows the key code with the first tumbler being
the first depth of the ...
Front Wheel Drive Intermediate Shaft Replacement
Front Wheel Drive Intermediate Shaft Replacement
Callout
Component Name
Preliminary Procedure
Raise and support the vehicle. Refer to Lifting and Jacking the
Vehicle.
Remove the wheel drive shaft assembly from the vehicle ...
Engine Coolant Thermostat Installation
Caution: Refer to Engine Coolant Thermostat Housing Caution.
Clean the engine coolant sealing surfaces.
Install the engine coolant seal (1).
Install the engine coolant thermostat assembly (2).
Caution: Refer to Fastener Caution.
Install the 4R ...