Engine Cooling
Coolant System FlushingInstrument Panel Center Upper Molding Replacement
Instrument Panel Center Upper Molding Replacement
Callout
Component Name
Preliminary Procedure
Remove the instrument panel center molding. Refer to Instrument Panel
Center Molding Replacement.
1
...
Crankshaft Rear Oil Seal Installation
Special Tools
EN-658-1 Installer
EN-235-6 Installer
For equivalent regional tools, refer to Special Tools.
Slide the crankshaft rear oil seal (2) across the EN-235-6 installer (1).
Install the crankshaft rear oil seal (1) with EN-235-6 installer ...
Turbocharger Assemble
Caution: Refer to Fastener Caution.
Install the NEW quick fitting connector (2) and a NEW seal ring (1) to the
turbocharger and tighten to 20 Y (15 lb ft).
Inspect the turbocharger coolant pipes for ridges and damage.
Install the tur ...