|
Callout |
Component Name |
|---|---|
|
1 |
Output Carrier Assembly Note:
|
|
2 |
Output Carrier Thrust Bearing Assembly |
|
3 |
Input Sun Gear Thrust Bearing Assembly |
|
4 |
Input Carrier Assembly Note:
|
|
5 |
Input Sun Gear |
|
6 |
Input Sun Gear Thrust Bearing Assembly |
|
7 |
Input Carrier Thrust Bearing Assembly |
|
8 |
Reaction Carrier Assembly Note: Starting in 2012, all 6T30/40/45/50 models have 3 pinion reaction carriers. The 3 pinion reaction carriers are back serviceable for all models.
|
|
9 |
Reaction Carrier Sun Gear Assembly |
|
10 |
Reaction Carrier Sun Gear Thrust Bearing Note: The sun gear thrust bearing may be stuck to the sun gear. |
|
11 |
3? Reverse and 4?? Clutch Housing Assembly |
Input, Reaction, and Output Carrier Assemble (Gen 2)
Internal Components RemovalRear Side Door Window Outer Sealing Strip Replacement (Sedan)
Rear Side Door Window Outer Sealing Strip Replacement
Callout
Component Name
1
Rear Side Door Window Outer Sealing Strip
Procedure
Use the appropriate tool, lift one end up and pull away from the door
flange t ...
Rear Seat Center Shoulder Belt Replacement (Hatchback)
Rear Seat Center Shoulder Belt Replacement
Callout
Component Name
Preliminary Procedures
Remove the rear seat cushion. Refer to Rear Seat Cushion Removal
and Installation.
Remove the rear seat back cushion. Refer to Rear ...
Engine Flywheel Installation
Special Tools
EN-652 Flywheel Holder
EN-45059 Torque Angle Sensor Kit
For equivalent regional tools, refer to Special Tools.
Clean the thread in the crankshaft.
Install the crankshaft position reluctor ring (1).
Install the flywheel (2).
Install the EN-652 ...