Callout |
Component Name |
---|---|
1 |
Instrument Panel Center Molding Assembly Procedure
|
Strut and Shock Absorber Inspection
Note: The strut assembly DOES NOT have to be removed from the vehicle
to perform the following inspection procedure.
Note: A light film of oil on the top portion of the strut is normal.
DO NOT replace the strut for this condition.
Condition 1
Oil or fluid residue only o ...
Secondary Air Injection Check Valve Installation
Install a NEW secondary air injection check valve gasket (1).
Install the secondary air injection check valve (2).
Caution: Refer to Fastener Caution.
Install the 3 secondary air injection check valve bolts (3) and tighten
to 22 Y (16& ...
Transmission Fluid Pump Assemble (6T40/45/50)
Table 1:
Fluid Pump w/Valve Trains Assemble
Table 2:
Torque Converter Fluid Seal and Fluid Filter Assembly
Assemble
Fluid Pump w/Valve Trains Assemble
Fluid Pump w/Valve Trains Assemble
Callout
Comp ...