|
Callout |
Component Name |
|---|---|
|
Preliminary Procedure
Remove the generator. Refer to Generator Replacement. |
|
|
1 |
Oil Flow Check Valve Bore Plug Caution: Refer to Fastener Caution.
21 Y (16 lb ft) |
|
2 |
Oil Flow Check Valve |
Oil Lines
Oil PumpBattery Replacement
Removal Procedure
Open the hood.
Disconnect the negative battery cable. Refer to Battery Negative Cable
Disconnection and Connection.
Remove the battery retainer bolt (1) and the battery retainer (2).
Loosen the battery positive cable ju ...
Sun Load Temperature Sensor Replacement
Sun Load Temperature Sensor Replacement
Callout
Component Name
1
Sun Load Temperature Sensor Bezel
2
Sun Load Temperature Sensor
Procedure
Disconnect the electrical connector.
Twist ...
Water Pump Replacement (LUW)
Removal Procedure
Drain the cooling system. Refer to Cooling System Draining and Filling.
Remove the water pump pulley. Refer to Water Pump Pulley Replacement.
Remove the 5 water pump bolts (2).
Remove the water pump (1).
Insta ...