|
Callout |
Component Name |
|---|---|
|
1 |
Roof Rail Rear Assist Handle Fastener (Qty:?€‰2) Caution: Refer to Fastener Caution.
6?€‰Y?€‰(53?€‰lb?€‰in) |
|
2 |
Roof Rail Rear Assist Handle Assembly |
Roof Rail Front Assist Handle Replacement
HeadliningEngine Front Cover Gasket Installation
Clean the sealing surfaces and remove all remains of old sealing compound
material.
Note: The thickness of the sealing bead should be 2 mm (0.0787 in).
Apply sealing compound to the shown areas (1) and (2). Refer to Adhesives,
Fluids ...
Secondary Air Injection Pump Pipe Replacement
Secondary Air Injection Pump Pipe Replacement
Callout
Component Name
1
Hose Retainer (QTY:2)
Note: Squeeze the retainer on opposite sides to release.
2
Secondary Air Injection ...
Torque Converter Housing with Fluid Pump Assembly Removal (Non Hybrid)
Torque Converter Housing with Fluid Pump Assembly Removal
Callout
Component Name
1
Torque Converter and Differential Housing Bolts M8 x 30 (Qty: 15)
2
Torque Conv ...