Rear Wheelhouse Liner Replacement (Sedan - Right)
Cargo Tie Down Loop ReplacementFront Floor Console Extension Replacement - Right Side
Front Floor Console Extension Replacement - Right Side
Callout
Component Name
1
Front Floor Console Extension
Procedure
Use a flat bladed plastic trim tool in order to release the retainers
securing the extens ...
Camshaft Timing Chain Installation
Special Tools
EN-952 Fixing Pin
EN-953-A Fixing Tool
EN-955-10 Fixing Pin from EN-955 Kit
For equivalent regional tools, refer to Special Tools.
The engine should be adjusted to TDC.
The crankshaft should be locked with EN-952 fixing pin.
The camshaft should be locked with EN-9 ...
Timing Belt Inspection
Special Tools
EN-6340 Locking Tool
EN-6628-A Locking Tool
For equivalent regional tools, refer to Special Tools.
Removal Procedure
Remove the timing belt upper front cover. Refer to Timing Belt Upper
Front Cover Removal.
Set the crankshaft balancer in the ...