Full-Cut Method Description
Note:
If corrosion of the pinch-weld flange is present, or if sheet metal
repairs or replacements are required, refinish the pinch-weld flange in
order to present a clean, primer-only surface.
If paint repairs are required, mask the flange bonding area, prior to
applying th ...
Instrument Panel Outer Air Outlet Replacement - Left Side
Instrument Panel Outer Air Outlet Replacement - Left Side
Callout
Component Name
Preliminary Procedure
Remove the left instrument panel upper trim panel. Refer to Instrument
Panel Upper Trim Panel Replacement - Left Side.
...
Air Inlet Valve Actuator Replacement (LHD)
Air Inlet Valve Actuator Replacement
Callout
Component Name
Preliminary Procedures
Remove the instrument panel compartment. Refer to Instrument Panel
Lower Compartment Replacement.
Reposition any wiring or hoses to gain a ...