|
Application |
Specification |
|
|---|---|---|
|
Metric |
English |
|
|
Clamp Fit TPM Stem Locknut |
7 Y Dynamically |
62 lb in |
|
Clamp Fit TPM Stem Locknut |
4 Y Statically |
35 lb in |
Caster Description
Front Camber AdjustmentRear Side Door Opening Floor Carpet Retainer Replacement
Rear Side Door Opening Floor Carpet Retainer Replacement
Callout
Component Name
Preliminary Procedure
Remove the rear seat cushion. Refer to Rear Seat Cushion Removal and
Installation.
1
Rear Si ...
Battery Positive Cable Replacement
Removal Procedure
Disconnect the negative battery cable. Refer to Battery Negative Cable
Disconnection and Connection.
Remove the underhood fuse block cover.
Remove the battery positive nut (1) and the battery positive cable (2),
from the underhood fus ...
Fuel Tank Filler Door Replacement
Fuel Tank Filler Door Replacement
Callout
Component Name
1
Fuel Tank Filler Door
Procedure
Position the fuel tank filler door to the full open position. Using light
outward sliding pressure on the filler door, ...