|
Application |
Specification |
|
|---|---|---|
|
Metric |
English |
|
|
Clamp Fit TPM Stem Locknut |
7 Y Dynamically |
62 lb in |
|
Clamp Fit TPM Stem Locknut |
4 Y Statically |
35 lb in |
Caster Description
Front Camber AdjustmentFuel Tank Filler Door Replacement
Fuel Tank Filler Door Replacement
Callout
Component Name
1
Fuel Tank Filler Door
Procedure
Position the fuel tank filler door to the full open position. Using light
outward sliding pressure on the filler door, ...
Strut and Shock Absorber Inspection
Note: The strut assembly DOES NOT have to be removed from the vehicle
to perform the following inspection procedure.
Note: A light film of oil on the top portion of the strut is normal.
DO NOT replace the strut for this condition.
Condition 1
Oil or fluid residue only o ...
Front Wheel Speed Sensor Replacement
Removal Procedure
Warning: Refer to Brake Dust Warning.
Raise and support the vehicle. Refer to Lifting and Jacking the Vehicle.
Remove the tire and wheel assembly. Refer to Tire and Wheel Removal
and Installation.
Clean the wheel speed sensor mounting area on t ...