Callout |
Component Name |
---|---|
Preliminary Procedure
Remove the right instrument panel upper trim panel. Refer to Instrument Panel Upper Trim Panel Replacement - Right Side. |
|
1 |
Instrument Panel Compartment Fastener (Qty:?€‰6) Caution: Refer to Fastener Caution. |
2 |
Instrument Panel Compartment Procedure
When replacing the instrument panel compartment, transfer all necessary components if applicable. |
Transmission Fluid Pump, Front Differential Carrier Baffle, and Front Differential
Ring Gear Removal (6T40/45)
Transmission Fluid Pump, Front Differential Carrier Baffle, and Front
Differential Ring Gear Removal
Callout
Component Name
1
Front Differential Carrier Baffle Bolts M6 x 25 (Qty: 2)
...
Intake Camshaft Replacement
Removal Procedure
Remove the camshaft intake and exhaust sprocket. Refer to Camshaft Intake
and Exhaust Sprocket Replacement.
Remove the camshaft bearing cap bolts in sequence shown. Ensure to remove
the bolts one turn at a time until there is no spring tension p ...
Control Valve Body Assembly Disassemble (Gen 2)
Control Valve Body Assembly Disassemble
Callout
Component Name
1
Control Solenoid Valve Support
2
Control Valve Body Bolt M5 x 40.5 (Qty: 1)
3
...