|
Callout |
Component Name |
|---|---|
|
1 |
Secondary Air Injection Outlet Pipe Note: Squeeze the retainer on opposite sides to release. |
|
2 |
Secondary Air Injection Check Valve Electrical Connector |
|
3 |
Secondary Air Injection Check Valve Bolts (Qty: 3). Caution: Refer to Fastener Caution.
25 Y (18 lb ft) |
|
4 |
Secondary Air Injection Check Valve |
|
5 |
Secondary Air Injection Check Valve Gasket |
Plastic Collar Quick Connect Fitting Service
Secondary Air Injection Pump Air Cleaner Pipe ReplacementFront Disc Brake Pads Replacement
Removal Procedure
Warning: Refer to Brake Dust Warning.
Note: Always replace disc brake pads in axle sets.
Inspect the fluid level in the brake master cylinder reservoir.
If the brake fluid level is midway between the maximum-full point and
the minimum allowab ...
Replacing Engine Gaskets
Gasket Reuse and Applying Sealants
Do not reuse any gasket unless specified.
Gaskets that can be reused will be identified in the service procedure.
Do not apply sealant to any gasket or sealing surface unless called
out in the service information.
Separating ...
Throttle Body Installation
Install the throttle body (2) and a NEW throttle body seal ring (1).
Caution: Refer to Fastener Caution.
Install the 4 throttle body bolts (3) and tighten to 8 Y (71 lb in).
...