|
Callout |
Component Name |
|---|---|
|
1 |
Secondary Air Injection Outlet Pipe Note: Squeeze the retainer on opposite sides to release. |
|
2 |
Secondary Air Injection Check Valve Electrical Connector |
|
3 |
Secondary Air Injection Check Valve Bolts (Qty: 3). Caution: Refer to Fastener Caution.
25 Y (18 lb ft) |
|
4 |
Secondary Air Injection Check Valve |
|
5 |
Secondary Air Injection Check Valve Gasket |
Plastic Collar Quick Connect Fitting Service
Secondary Air Injection Pump Air Cleaner Pipe ReplacementFront Side Door Lock Cylinder Rod Replacement
Front Side Door Lock Cylinder Rod Replacement
Callout
Component Name
Preliminary Procedure
Remove the rear side door window rear guide. Refer to Rear Side
Door Window Rear Guide Replacement.
Remove the rear side door lock ...
Front Side Door Trim Replacement
Front Side Door Trim Replacement
Callout
Component Name
Preliminary Procedure
Remove the front side door upper front trim panel. Refer to Front Side
Door Upper Front Trim Panel Replacement.
1
Fr ...
Fuel Tank Pressure Sensor Replacement
Fuel Tank Pressure Sensor Replacement
Callout
Component Name
Preliminary Procedure
Remove the fuel tank. Refer to Fuel Tank
Replacement.
1
Fuel Tank Pressure Sensor
Procedure
Disco ...