Callout |
Component Name |
---|---|
Preliminary Procedure
|
|
1 |
Front Air Deflector Retainers (Qty?€‰:2) |
2 |
Front Air Deflector Bolts (Qty?€‰:2) Caution: Refer to Fastener Caution.
8?€‰Y (71?€‰lb?€‰in) |
3 |
Front Air Deflector |
TPMS Sensor Matching Process
Each TPMS sensor has a unique identification code. The identification code needs
to be matched to a new tire/wheel position after rotating the tires or replacing
one or more of the TPMS sensors. The TPMS sensor matching process should also be
performed after replacing a spare tire with a road ...
Cylinder Head Installation
Special Tools
EN-45059 Torque Angle Sensor Kit
For equivalent regional tools, refer to Special Tools.
Clean the sealing surfaces.
Inspect for plane surface.
Cylinder block, cylinder head
Straight-edge, feeler gauge
Install the cylinder head gasket.
Install the cylinder head. ...
Front Differential Carrier Installation (6T40/45/50)
Front Differential Carrier Installation
Callout
Component Name
1
Final Drive Sun Gear
2
Differential Carrier Assembly
3
Front Differential Carrier Bearing Asembly
...