Callout |
Component Name |
---|---|
Preliminary Procedures
|
|
1 |
Instrument Panel Insulator |
Rear Wheelhouse Liner Replacement (Sedan - Left)
Rear Wheelhouse Liner Replacement
Callout
Component Name
Preliminary Procedure
Remove the tire and wheel assembly. Refer to Tire and Wheel Removal and
Installation.
1
Rear Wheelhouse Panel Liner ...
Instrument Panel Center Molding Replacement (Without U58)
Instrument Panel Center Molding Replacement
Callout
Component Name
1
Instrument Panel Center Molding Assembly
Procedure
Use a flat bladed plastic trim tool in the shown locations, then
rotate the trim tool 90 ...
Transmission Fluid Pump, Front Differential Carrier Baffle, and Front Differential
Ring Gear Installation (6T40/45)
Transmission Fluid Pump, Front Differential Carrier Baffle, and Front
Differential Ring Gear Installation
Callout
Component Name
1
Torque Converter and Differential Housing Seal
2
Fluid Pu ...