Chevrolet Sonic manuals

Chevrolet Sonic Repair Manual: Secondary Air Injection Pump Pipe Replacement

Chevrolet Sonic Repair Manual / Powertrain / Engine / Emissions / Air Injection / Secondary Air Injection Pump Pipe Replacement



Secondary Air Injection Pump Pipe Replacement

Callout

Component Name

1

Hose Retainer (QTY:2)

Note:

Squeeze the retainer on opposite sides to release.

2

Secondary Air Injection Pipe.

Procedure

Disconnect the pipe from the secondary air injection pump and the secondary air injection check valve.

Secondary Air Injection Pump Pipe Removal
Disconnect the secondary air injection pump pipe (3) from the secondary air injection check valve. Refer to Plastic Collar Quick Connect Fitting Service. ...

Secondary Air Injection Pump Removal
Disconnect the secondary air injection pump pipe (3). Refer to Plastic Collar Quick Connect Fitting Service. Remove the secondary air injection pump nut (2) and the 2  ...

Other materials:

Communication Interface Module Replacement
Communication Interface Module Replacement Callout Component Name Preliminary Procedure Remove the instrument panel lower compartment. Refer to Instrument Panel Lower Compartment Replacement. Remove the instrument pa ...

Hood Primary Latch Release Cable Replacement
iv Hood Primary Latch Release Cable Replacement Callout Component Name Preliminary Procedures Remove the radiator opening upper cover. Refer to Front Opening Upper Cover Replacement. Remove the air inlet grille. Refer to A ...

Bushing and Mating Shaft Inspection
Note: Proper bushing and corresponding mating shaft inspection should be performed before replacing the bushing, shaft, and in some cases, the component which houses the bushing. Thoroughly clean and dry the bushing and shaft surfaces before inspecting for damage. Any of the followin ...

В© 2014-2026 Copyright www.csmans.com
 
0.0052