|
Callout |
Component Name |
|---|---|
|
1 |
Hose Retainer (QTY:2) Note: Squeeze the retainer on opposite sides to release. |
|
2 |
Secondary Air Injection Pipe. Procedure
Disconnect the pipe from the secondary air injection pump and the secondary air injection check valve. |
Secondary Air Injection Pump Pipe Removal
Secondary Air Injection Pump RemovalCommunication Interface Module Replacement
Communication Interface Module Replacement
Callout
Component Name
Preliminary Procedure
Remove the instrument panel lower compartment.
Refer to Instrument Panel Lower Compartment
Replacement.
Remove the instrument pa ...
Hood Primary Latch Release Cable Replacement
iv
Hood Primary Latch Release Cable Replacement
Callout
Component Name
Preliminary Procedures
Remove the radiator opening upper cover. Refer to Front Opening
Upper Cover Replacement.
Remove the air inlet grille. Refer to A ...
Bushing and Mating Shaft Inspection
Note: Proper bushing and corresponding mating shaft inspection should
be performed before replacing the bushing, shaft, and in some cases, the component
which houses the bushing. Thoroughly clean and dry the bushing and shaft surfaces
before inspecting for damage.
Any of the followin ...