Throttle Body Installation
Tools and EquipmentBody Panel Paint Protector Replacement (VGC)
The paint protective film and vehicle surface temperature should be 13?€“32?°C
(55?€“90?°F) for best results.
Automatic car washes should be avoided for at least 24?€‰hours after the
paint protective film application.
Wipe the vehicle surface with isopropyl alcohol or fl ...
Brake Pressure Modulator Valve Bracket Replacement
Removal Procedure
Remove the brake pressure modulator valve (BPMV) and bracket assembly.
Refer to Brake Pressure Modulator Valve Replacement.
Remove the BPMV bolts (1).
Remove the BPMV bracket.
Installation Procedure
Install the BPMV br ...
Fuel Injection Fuel Rail Assembly Replacement
Removal Procedure
Disconnect battery negative cable. Refer to Battery Negative Cable Disconnection
and Connection.
Remove engine cover. Refer to Engine Cover Replacement.
Remove the fuel feed pipe from fuel injection fuel rail. Refer to Fuel
Feed Pipe Replacement.
Re ...