|
Callout |
Component Name |
|---|---|
Preliminary Procedure
|
|
|
1 |
Fuel Rail |
|
2 |
Fuel Injector |
|
3 |
Fuel Injector Seal Ring |
|
4 |
Fuel Injector Retainer Clamp |
Fuel Injection Fuel Rail Assembly Replacement
Fuel Pressure MeasurementFront Side Door Opening Floor Carpet Retainer Replacement
Front Side Door Opening Floor Carpet Retainer Replacement
Callout
Component Name
1
Front Side Door Opening Floor Carpet Retainer Retainer
2
Front Side Door Opening Floor Carpet Retainer Clip
...
Body Panel Paint Protector Replacement (VGC)
The paint protective film and vehicle surface temperature should be 13?€“32?°C
(55?€“90?°F) for best results.
Automatic car washes should be avoided for at least 24?€‰hours after the
paint protective film application.
Wipe the vehicle surface with isopropyl alcohol or fl ...
Engine Oil Cooler Pipe Replacement (LUW)
Engine Oil Cooler Pipe Replacement
Callout
Component Name
Preliminary Procedures
Drain the cooling system. Refer to Cooling System Draining and Filling.
Remove the exhaust manifold with catalytic converter. Refer to Exhaus ...