|
Callout |
Component Name |
|---|---|
Preliminary Procedure
|
|
|
1 |
Spark Plugs Caution: Refer to Fastener Caution.
25 Y (18 lb ft) Special Tools
EN-194-E Spark Plug Remover For equivalent regional tools, refer to Special Tools. |
Spark Plug Inspection
Special ToolsBlower Motor Replacement
Removal Procedure — Production Blower Motor
Remove the passenger side instrument panel insulator. Refer to Instrument
Panel Insulator Replacement.
Remove the passenger side inflatable restraint instrument panel lower
module. Refer to Instrument Panel Lower Airbag Replaceme ...
Front Differential Carrier Installation (6T40/45/50)
Front Differential Carrier Installation
Callout
Component Name
1
Final Drive Sun Gear
2
Differential Carrier Assembly
3
Front Differential Carrier Bearing Asembly
...
Transmission Fluid Pump, Front Differential Carrier Baffle, and Front Differential
Ring Gear Removal (6T30)
Transmission Fluid Pump, Front Differential Carrier Baffle, and Front
Differential Ring Gear Removal
Callout
Component Name
1
Front Differential Carrier Baffle Bolts M6 x 25 (Qty: 2)
...