|
Callout |
Component Name |
|---|---|
Preliminary Procedures
|
|
|
1 |
Front Floor Panel Carpet Assembly |
Floor Carpet Drying
Front Side Door Opening Floor Carpet Retainer ReplacementFront Seat Belt Anchor Plate Tensioner Replacement
Front Seat Belt Anchor Plate Tensioner Replacement
Callout
Component Name
Warning: Refer to SIR Warning.
Warning: In order to prevent accidental deployment and the
risk of personal injury, do not dispose of a ...
Steering Linkage Outer Tie Rod Inspection
Special Tools
GE-8001 Dial Indicator Set
For equivalent regional tools, refer to Special Tools.
Note: This inspection procedure does not supersede local government
required inspections that have more stringent requirements.
Inspect the outer tie rod seal. If the outer tie rod ...
Secondary Air Injection Pump Pipe Replacement
Secondary Air Injection Pump Pipe Replacement
Callout
Component Name
1
Hose Retainer (QTY:2)
Note: Squeeze the retainer on opposite sides to release.
2
Secondary Air Injection ...