Park - Engine Running (Gen 2)Backup Lamp Bulb Replacement (Sedan)
Backup Lamp Bulb Replacement
Callout
Component Name
Preliminary Procedure
Remove the tail lamp assembly. Refer to Tail Lamp Replacement.
1
Back Up Lamp Bulb Socket
Procedure
Rotate the back u ...
Tire and Wheel Removal and Installation
Special Tools
CH-41013 Rotor Resurfacing Kit
CH-42450-A Wheel Hub Resurfacing Kit
For equivalent regional tools, refer to Special Tools.
Removal Procedure
Raise and support the vehicle. Refer to Lifting and Jacking the Vehicle.
Remove the wheel cover ...
Fuel Pump Control Module Programming and Setup
The fuel pump control module must be programmed with the proper calibration software.
The module stores and utilizes this information however if it is not properly configured
with the correct calibration software, the fuel pump control module will not control
all of the vehicle features proper ...