|
Callout |
Component Name |
|---|---|
|
Preliminary Procedure
Remove the instrument panel insulator, if equipped. |
|
|
1 |
Blower Motor Resistor Screw (Qty: 2) Caution: Refer to Fastener Caution. |
|
2 |
Blower Motor Resistor Procedure
Disconnect the wiring connector. |
Heater and Air Conditioning Evaporator and Blower Module Removal and Installation
HeatingInstrument Panel Center Molding Replacement (With U58)
Instrument Panel Center Molding Replacement
Callout
Component Name
1
Instrument Panel Center Molding Assembly
Procedure
Use a flat bladed plastic trim tool in the shown locations, then
rotate the trim tool 90 ...
Heating and Air Conditioning System Description and Operation
Engine Coolant
Engine coolant is the key element of the heating system. The engine thermostat
controls the normal engine operating coolant temperature. Coolant pumped out
of the engine enters the heater core through the inlet heater hose. The air
flowing through the HVAC module abs ...
Low and Reverse and 1-2-3-4 Clutch Housing Cleaning and Inspection
Low and Reverse and 1-2-3-4 Clutch Housing Cleaning and Inspection
Callout
Component Name
Caution: After cleaning the transmission components, allow
to air dry. Do not use cloth or paper towels in order to dry any transmi ...