
|
Callout |
Component Name |
|---|---|
|
Preliminary Procedure
Remove the front side door trim panel. Refer to Front Side Door Trim Replacement. |
|
|
1 |
Front Side Door Check Link Bolt to Body Caution: Refer to Fastener Caution. Note: Place the door window in the full open position.
22?€‰Y (16?€‰lb?€‰ft) |
|
2 |
Front Side Door Check Link Nut (Qty:?€‰2) Procedure
Remove the water deflector. Tighten
5.5?€‰Y (49?€‰lb?€‰in) |
|
3 |
Front Side Door Check Link |
Front Side Door Adjustment
Front Side Door ReplacementSide Window Defogger Outlet Grille Replacement
Side Window Defogger Outlet Grille Replacement
Callout
Component Name
1
Side Window Defroster Outlet Grille (Qty:?€‰2)
Procedure
Use a flat bladed plastic trim tool to aid in the removal of the grille
ass ...
Environmental Fallout (Acid Rain)
Caution: Refer to Clearcoat/Ultraviolet Screeners Caution.
Note: Always refer to the manufacturer's packaged instructions for
the detailed procedures of materials used for compounding and/or polishing.
Since the severity of the condition varies from area to area, proper diagno ...
Tire and Wheel Balancing (Road Force Variation (RFV))
ALL wheel/tire assemblies must have a RFV within spec before being mounted
on vehicle.
Important: If a wheel/tire assembly is not within the RFV specification
after match mounting, the tire must be returned to the tire manufacturer.
DO NOT install tire/wheel assembly on a vehicl ...