|
Callout |
Component Name |
|---|---|
Preliminary Procedures
|
|
|
1 |
Rear Side Door Check Link Bolt to Body Caution: Refer to Fastener Caution
22?€‰Y (16?€‰lb?€‰ft) |
|
2 |
Rear Side Door Check Link Nut (Qty:?€‰2) Procedure
Remove the water deflector. Tighten
5.5?€‰Y (49?€‰lb?€‰in) |
|
3 |
Rear Side Door Check Link Assembly |
Rear Side Door Adjustment (4 Door Notch Back 69)
Rear Side Door Lock Cylinder Opening Cover ReplacementBody Panel Paint Protector Replacement (VGC)
The paint protective film and vehicle surface temperature should be 13?€“32?°C
(55?€“90?°F) for best results.
Automatic car washes should be avoided for at least 24?€‰hours after the
paint protective film application.
Wipe the vehicle surface with isopropyl alcohol or fl ...
Secondary Air Injection Pump Pipe Replacement
Secondary Air Injection Pump Pipe Replacement
Callout
Component Name
1
Hose Retainer (QTY:2)
Note: Squeeze the retainer on opposite sides to release.
2
Secondary Air Injection ...
3-5-Reverse and 4-5-6 Clutch Fluid Seal Ring Replacement (Gen 2)
3-5-Reverse and 4-5-6 Clutch Fluid Seal Ring Replacement
Callout
Component Name
Special Tools
DT-46620 Seal Installer
For equivalent regional tools, refer to Special
Tools.
1
3? Reverse and ...