Callout |
Component Name |
---|---|
1 |
Liftgate Weatherstrip Procedure
Clean the area where the seal will be mounted. Use a suitable solvent with a mixture of 50?€‰percent isopropyl alcohol and 50?€‰percent water by volume, or high-flash naphtha. |
Pretensioner Handling and Scrapping
Scrapping Procedure
During the course of a vehicles useful life, certain situations may arise
which will necessitate the disposal of a live (undeployed) pretensioner. The
following information covers the proper procedures for the disposing of a live
(undeployed) pretensioner. Deplo ...
Secondary Air Injection Check Valve Installation
Install a NEW secondary air injection check valve gasket (1).
Install the secondary air injection check valve (2).
Caution: Refer to Fastener Caution.
Install the 3 secondary air injection check valve bolts (3) and tighten
to 22 Y (16& ...
Charge Air Bypass Regulator Solenoid Valve Replacement
Charge Air Bypass Regulator Solenoid Valve Replacement
Callout
Component Name
1
Charge Air Bypass Regulator Solenoid Valve Hose (Qty: 3)
Procedure
Disconnect the electrical connector.
...