Reading Lamps
Battery Load ManagementFront Floor Console Cup Holder Replacement
Front Floor Console Cup Holder Replacement
Callout
Component Name
Preliminary Procedure
Remove the front floor console assembly. Refer to Front Floor Console
Replacement.
1
Front Floor Console C ...
Use of Room Temperature Vulcanizing (RTV) and Anaerobic Sealant
Pipe Joint Compound
Note: Three types of sealer are commonly used in engines. These
are RTV sealer, anaerobic gasket eliminator sealer, and pipe joint compound.
The correct sealer and amount must be used in the proper location to prevent
oil leaks. DO NOT interchange the 3 ...
Starter Installation
Install the starter (4).
Install the lower starter bolt stud (3) and if equipped the washer.
Install the upper starter bolt (2) and if equipped the washer (1).
Caution: Refer to Fastener Caution.
Tighten the starter bolt and starter bolt stud to 25 ...