|
Callout |
Component Name |
|---|---|
|
Preliminary Procedure
Drain the cooling system. Refer to Cooling System Draining and Filling. |
|
|
1 |
Engine Coolant Air Bleed Hose |
|
2 |
Throttle Body Heater Outlet Pipe Procedure
|
Throttle Body Heater Outlet Hose Replacement (LUW)
Throttle Body Inspection and CleaningRadio Replacement (Without US8)
Radio Replacement
Callout
Component Name
Preliminary Procedure
Remove the instrument panel center molding. Refer to
Instrument Panel Center Molding Replacement.
1
Radio Bolts (Qty: 4)
...
Transmission Indicators and Messages
The following transmission-related indicators and messages may be displayed on
the Instrument Panel Cluster (IPC). For a complete listing and description of all
vehicle indicators and messages, refer to Indicator/Warning
Message Description and Operation.
"TRANSMISSION HOT IDLE ...
Sunroof Actuator Motor Replacement
Sunroof Actuator Motor Replacement
Callout
Component Name
Preliminary Procedure
Remove the dome lamp bezel. Refer to Dome Lamp Bezel Replacement.
1
Sunroof Actuator Motor Screw (Qty:?€‰3)
...