|
Application |
Specification |
|
|---|---|---|
|
Metric |
English |
|
|
Clamp Fit TPM Stem Locknut |
7 Y Dynamically |
62 lb in |
|
Clamp Fit TPM Stem Locknut |
4 Y Statically |
35 lb in |
Caster Description
Front Camber AdjustmentBuying New Tires
GM has developed and matched specific tires for the vehicle. The original equipment
tires installed were designed to meet General Motors Tire Performance Criteria Specification
(TPC Spec) system rating. When replacement tires are needed, GM strongly recommends
buying tires with the same TPC Sp ...
Front Seat Outboard Seat Back Airbag Replacement
Front Seat Outboard Seat Back Airbag Replacement
Callout
Component Name
Warning: Following the deployment of a side impact air bag,
inspect the following parts for damage. Replace these parts if necessary:
...
Oil Level Indicator and Tube Installation
Install a NEW oil level indicator tube gasket.
Install the oil level indicator tube (2).
Caution: Refer to Fastener Caution.
Install the oil level indicator tube bolt (1) and tighten to 15 Y (11 lb ft).
Install the oil dipstick.
...