|
Callout |
Component Name |
|---|---|
|
1 |
Final Drive Sun Gear |
|
2 |
Differential Carrier Assembly |
Front Differential Carrier Cleaning and Inspection
Front Differential Carrier Installation (6T40/45/50)Rear Side Door Check Link Replacement
Rear Side Door Check Link Replacement
Callout
Component Name
Preliminary Procedures
Move the window to the full up position.
Remove the rear side door trim panel. Refer to Rear Side Door Trim
Replacement
...
2-6 Clutch Piston Installation (6T40/45/50)
2-6 Clutch Piston Installation
Callout
Component Name
1
2?E Clutch Piston Assembly
Note:
Position the 2?E piston air bleed and large slot toward the
top of the case.
DT-47796 seal protector ...
Drive and Driven Sprocket, Drive Link, and Park Pawl Installation (6T30)
Drive and Driven Sprocket, Drive Link, and Park Pawl Installation
Callout
Component Name
1
Front Differential Carrier Baffle
2
Baffle Retainer
3
Front Differential ...