|
Callout |
Component Name |
|---|---|
|
1 |
Final Drive Sun Gear |
|
2 |
Differential Carrier Assembly |
Front Differential Carrier Cleaning and Inspection
Front Differential Carrier Installation (6T40/45/50)Braking
Braking action involves perception time and reaction time. Deciding to push the
brake pedal is perception time. Actually doing it is reaction time.
Average driver reaction time is about three-quarters of a second. In that time,
a vehicle moving at 100 km/h (60 mph) travels 20m (66 ft), which co ...
Instrument Panel Outer Trim Cover Replacement
Instrument Panel Outer Trim Cover Replacement
Callout
Component Name
1
Instrument Panel Outer Trim Cover (Qty:?€‰2)
Procedures
Use a flat bladed plastic trim tool in order to disengage the retainers
securi ...
Rear Seat Head Restraint Replacement
Rear Seat Head Restraint Replacement
Callout
Component Name
1
Rear Seat Head Restraint
Preliminary Procedures
Depress the large button on the head restraint guide and raise the
head restraint to the full up p ...