Chevrolet Sonic manuals

Chevrolet Sonic Repair Manual: Front Differential Carrier Installation (6T40/45/50)

Chevrolet Sonic Repair Manual / Powertrain / Driveline / Differentials / Front Differential Carrier Installation (6T40/45/50)



Front Differential Carrier Installation

Callout

Component Name

1

Final Drive Sun Gear

2

Differential Carrier Assembly

3

Front Differential Carrier Bearing Asembly

Front Differential Carrier Installation (6T30)
Front Differential Carrier Installation Callout Component Name 1 Final Drive Sun Gear 2 Diff ...

Transmission Fluid Pump, Front Differential Carrier Baffle, and Front Differential Ring Gear Installation (6T30)
Transmission Fluid Pump, Front Differential Carrier Baffle, and Front Differential Ring Gear Installation Callout Component Name ...

Other materials:

Park Brake and P (Park) Mechanism Check
Warning When you are doing this check, the vehicle could begin to move. You or others could be injured and property could be damaged. Make sure there is room in front of the vehicle in case it begins to roll. Be ready to apply the regular brake at once should the vehicle begin to move. Park ...

Fog Lamps (RS)
To replace the front fog lamp bulb: 1. Locate the fog lamp located under the front fascia. 2. Remove the cap from the back of the fog lamp assembly. 3. Disconnect the electrical connector from the fog lamp bulb assembly. 4. Remove the bulb by turning it counterclockwise and pulling it straight ...

Low and Reverse and 1-2-3-4 Clutch Housing, and 1-2-3-4 Clutch Plate Installation (6T40/45/50)
Low and Reverse and 1-2-3-4 Clutch Housing, and 1-2-3-4 Clutch Plate Installation Callout Component Name 1 Low and Reverse and 1??? Clutch Housing Note: The longer legs face the bottom of the case and the ...

В© 2014-2026 Copyright www.csmans.com
 
0.0055