Callout |
Component Name |
---|---|
1 |
Final Drive Sun Gear |
2 |
Differential Carrier Assembly |
3 |
Front Differential Carrier Bearing Asembly |
Pretensioner Handling and Scrapping
Scrapping Procedure
During the course of a vehicles useful life, certain situations may arise
which will necessitate the disposal of a live (undeployed) pretensioner. The
following information covers the proper procedures for the disposing of a live
(undeployed) pretensioner. Deplo ...
Roof Outer Panel Replacement (5HB)
Removal Procedure
Warning: Refer to Approved Equipment for Collision Repair
Warning.
Disable the SIR system. Refer to SIR Disabling and Enabling.
Disconnect the negative battery cable. Refer to Battery Negative Cable
Disconnection and Connection.
Remove all ...
Front Wheel Drive Intermediate Shaft Replacement
Front Wheel Drive Intermediate Shaft Replacement
Callout
Component Name
Preliminary Procedure
Raise and support the vehicle. Refer to Lifting and Jacking the
Vehicle.
Remove the wheel drive shaft assembly from the vehicle ...