|
Callout |
Component Name |
|---|---|
|
1 |
Final Drive Sun Gear |
|
2 |
Differential Carrier Assembly |
|
3 |
Front Differential Carrier Bearing Asembly |
Front Differential Carrier Installation (6T30)
Transmission Fluid Pump, Front Differential Carrier Baffle, and Front Differential
Ring Gear Installation (6T30)Ignition Positions
The ignition switch has four different positions.
To shift out of P (Park), the ignition must be in ON/RUN and the regular brake
pedal applied.
1 (STOPPING THE ENGINE/LOCK/ OFF): When the vehicle is stopped, turn the ignition
switch to LOCK/ OFF to turn the engine off.
This position locks t ...
Engine Flywheel Installation
Special Tools
EN-652 Flywheel Holder
EN-45059 Torque Angle Sensor Kit
For equivalent regional tools, refer to Special Tools.
Clean the thread in the crankshaft.
Install the crankshaft position reluctor ring (1).
Install the flywheel (2).
Install the EN-652 ...
Engine Front Cover Gasket Installation
Clean the sealing surfaces and remove all remains of old sealing compound
material.
Note: The thickness of the sealing bead should be 2 mm (0.0787 in).
Apply sealing compound to the shown areas (1) and (2). Refer to Adhesives,
Fluids ...