|
Callout |
Component Name |
|---|---|
|
1 |
Front Differential Carrier Bearing Assembly |
|
2 |
Differential Carrier Assembly |
|
3 |
Final Drive Sun Gear |
Differential Carrier Removal (6T30)
Front Differential Carrier Cleaning and InspectionFuel Tank Filler Door Replacement
Fuel Tank Filler Door Replacement
Callout
Component Name
1
Fuel Tank Filler Door
Procedure
Position the fuel tank filler door to the full open position. Using light
outward sliding pressure on the filler door, ...
Special Tools
Illustration
Tool Number/Description
BO-49385
BO-6626
KM-6626
S0201912
Wiper Arm Puller
...
Drive Range, First Gear Engine Braking (Gen 2)
Note: Some models of the 6T30/40/45/50 automatic transmission are equipped with
an electric auxiliary fluid pump for use in hybrid vehicles (BAS+). Hybrid vehicles
do not require internal combustion engine (ICE) operation at all times. After a
successful engine start, the hybrid powertrain con ...