Inflatable Restraint Sensing and Diagnostic Module Programming and Setup
Pretensioner Handling and ScrappingWater Outlet Installation
Clean the sealing surfaces.
Install the water outlet (2) and a NEW water outlet seal ring (1).
Caution: Refer to Fastener Caution.
Install the 3 water outlet bolts (3) and tighten to 8 Y (71 lb in).
...
Water Pump Installation
Clean the sealing surfaces and the 3 coolant pump threads.
Install NEW gasket.
Caution: Refer to Fastener Caution.
Caution: Refer to Torque-to-Yield Fastener Caution.
Install the coolant pump (1).
Install 5 NEW bolts (2) and tighten to 8& ...
Intake Manifold Assemble (1.6L LDE)
Install the 4 multiport fuel injector seals (6).
Install the multiport fuel injection fuel rail (4) and the fuel injectors (5)
to the intake manifold (7).
Caution: Refer to Fastener Caution.
Install the 2 multiport fuel injection fue ...