|
Illustration |
Tool Number/Description |
|---|---|
|
CH 21177 J 21177-A Drum to Brake Shoe Clearance Gauge |
|
CH 41013 J 41013 Rotor Resurfacing Kit |
|
CH 42450-A J 42450-A Wheel Hub Resurfacing Kit |
|
CH 8001 J 8001 Dial Indicator Set |
Rear Wheel Bearing and Hub Replacement (Drum Brake)
Brake Shoe Replacement (J93, J94)Intake Manifold Installation
Clean the sealing surfaces.
Install the intake manifold (1) along with a NEW intake manifold gasket.
Caution: Refer to Fastener Caution.
Install the 6 intake manifold bolts (1) and tighten to 20 Y (15 lb ft).
...
Changing wheels and tires
Tire rotation
To maintain optimal performance and extend tire life on your Nissan Armada, it
is strongly recommended to rotate the tires at regular intervals of approximately
10,000 miles (16,000 km).
Consistent tire rotation helps ensure even tread wear, improves ride comfort,
and contr ...
Explanation of scheduled maintenance items
Basic information
The following section provides a detailed overview to help you better understand
the scheduled maintenance requirements for your Nissan Armada. These descriptions
explain why each service item is important and how it contributes to the long-term
reliability, safety, and perf ...