Electrical
Cruise Control Package InstallationTurn and Lane-Change Signals
Move the lever all the way up or down to signal a turn.
An arrow on the instrument cluster will flash in the direction of the turn or
lane change.
Raise or lower the lever until the arrow starts to flash to signal a lane change.
Hold it there until the lane change is completed. If the lever ...
Instrument Panel Center Trim Panel Replacement
Instrument Panel Center Trim Panel Replacement
Callout
Component Name
1
Instrument Panel Center Trim Panel (Qty:?€‰2)
Procedure
Use a flat bladed plastic trim tool in order to disengage the retainers
secur ...
Torque Converter Housing with Fluid Pump Assembly Removal (Non Hybrid)
Torque Converter Housing with Fluid Pump Assembly Removal
Callout
Component Name
1
Torque Converter and Differential Housing Bolts M8 x 30 (Qty: 15)
2
Torque Conv ...